Services/CNC Bending/First-Article Inspection (FAI)
    Capability 13

    First-Article Inspection (FAI)

    Dimensional proof before production begins - AS9102 reports with CMM and laser arm, ±0.005mm accuracy.

    Technical data

    By the numbers.

    Every figure is a working machine specification, not a catalogue estimate. Our equipment is calibrated quarterly.

    CMM envelope
    1200 × 900 × 700 mm (scanning probe)
    Laser arm reach
    2400 mm (6-axis)
    Volumetric accuracy
    ±0.005 mm (CMM), ±0.025 mm (laser arm)
    GD&T callout support
    Full ASME Y14.5M
    Report format
    AS9102 / customer template / PPAP
    Turnaround
    24 h express available
    Measurement points
    Up to 5000 per part
    Scanning resolution
    0.5 mm point spacing
    First-Article Inspection (FAI) process at our facility
    Quality in action

    See how we deliver precision.

    Our state-of-the-art facility houses the latest equipment operated by certified technicians. Every process is monitored and documented to ensure consistent quality across all production runs.

    ISO 9001:2025 certified
    24/7 quality monitoring
    Certified technicians
    Digital traceability
    Take a virtual tour
    What's included

    Capabilities in detail.

    CMM with contact scanning and portable laser arm for large parts
    GD&T balloon-indexed reports with deviation per characteristic
    3D CAD comparison with colour deviation map (to 0.01mm scale)
    PPAP Level 1 – 5 packages (dimensional, material, functional)
    Third-party witness inspection arranged (TUV, BV, etc.)
    Digital report delivery via secure portal with PDF and Excel
    Materials processed
    Any fabricated component - sheet metal, machined, welded, assembled
    Typical applications
    • Aerospace sub-assemblies (AS9102D)
    • Automotive BIW parts (PPAP Level 3)
    • Defence components with traceability
    • Critical structural nodes for offshore
    Need mill certs?

    All materials supplied with EN 10204 3.1 traceability on request.

    Ask our team
    How it works

    Our process, simplified.

    From initial consultation to final delivery, we maintain transparency and quality at every step.

    01

    Consultation

    Requirements gathering & feasibility analysis

    02

    Design

    3D modeling & engineering approval

    03

    Fabrication

    Precision manufacturing & in-process QC

    04

    Delivery

    Final inspection & logistics coordination

    FAQs

    Common questions.

    Can't find your answer? Email our team

    Start your project

    Ready to discuss your first-article inspection (fai) project?

    Send us your drawings or spec sheet. We'll have a quote and schedule back to you within 24 hours.